Free V2G Financial Tool

V2G Revenue Calculator

Estimate how much money your electric vehicle could earn by exporting electricity to the grid. Calculate export income, charging expenses, battery wear, aggregator fees and potential net profit from vehicle-to-grid operation.

1. V2G energy and participation

Examples: CHF, EUR, USD, GBP.
Energy delivered to the grid, measured at the export point.
The amount received for each kWh exported.
The price paid to recharge the battery.

2. Efficiency and battery costs

Energy exported divided by energy purchased to restore it, expressed as a percentage.
Your estimated financial allowance for battery wear.
Used to estimate equivalent full cycles.
Percentage deducted from gross export and grid-service income.

3. Additional V2G income and expenses

Optional payment for services such as flexibility or frequency response. Avoid double-counting export compensation.
Connection, transaction or participation fee.
Optional monthly equipment, installation financing or service costs.
Optional bidirectional charger and installation investment.
Used to estimate an annualized investment allowance.
How to enter the prices: Use the actual tariff applicable to your vehicle, charger and electricity contract. If your aggregator already reports a payment net of fees, set the aggregator fee to zero. If grid-service payments are included in your export price, do not enter them again as additional income.

How the V2G Revenue Calculator Works

Vehicle-to-grid technology allows a compatible electric vehicle to send stored electricity back to the power grid. Depending on the market and contract, an EV owner may receive payment for exported electricity or for providing grid services.

1. Gross electricity export revenue

The first part of the calculation estimates the income from selling electricity back to the grid.

Annual export revenue = Exported energy per session × Sessions per year × Export price

2. Electricity recharge costs

Electricity must be purchased to restore the energy exported by the vehicle. Because charging and discharging are not perfectly efficient, the amount purchased is greater than the energy ultimately delivered to the grid.

Recharge energy = Exported energy ÷ Round-trip efficiency

Recharge cost = Recharge energy × Electricity purchase price

3. Battery degradation cost

Additional battery cycling can contribute to battery wear. This calculator allows an estimated degradation cost per exported kWh to be entered as a financial allowance.

Battery wear cost = Annual exported energy × Degradation cost per kWh

4. Aggregator and operating fees

An aggregator or V2G platform may retain a share of the revenue. Other possible expenses include session charges, recurring service fees and equipment-related costs.

5. Net V2G operating profit

Net operating profit is the estimated gross income after subtracting recharge electricity, battery degradation, aggregator fees, session charges and recurring fixed costs.

Important: The investment allowance is a simple straight-line annual allocation of the entered equipment investment over the selected recovery period. It is not a discounted cash-flow or financing calculation.

What Determines V2G Profitability?

Electricity price difference

The difference between the electricity purchase price and the export compensation is a major factor. A higher export price does not necessarily mean a profitable transaction because charging losses and battery wear must also be considered.

Round-trip efficiency

Round-trip efficiency describes how much of the energy used to charge a battery can later be delivered as useful energy. Lower efficiency increases the amount of electricity that must be purchased to replace exported energy.

Battery degradation

Battery wear can reduce the economic benefit of V2G participation. The appropriate degradation allowance depends on the battery, operating strategy and expected replacement or warranty costs.

Grid-service compensation

Some V2G arrangements may offer additional compensation for flexibility, balancing or other grid services. These payments may use different pricing structures from ordinary electricity export and should be entered separately only when they are genuinely additional.

Vehicle and charger compatibility

The vehicle, bidirectional charger, energy management system and relevant grid connection must support the intended V2G operation. Availability and market participation rules vary between regions.

How to Improve V2G Earnings

Frequently Asked Questions

1. What is a V2G revenue calculator?

A V2G revenue calculator estimates the potential income and expenses associated with exporting electricity from an electric vehicle battery to the grid.

2. How much money can an EV earn from V2G?

Earnings depend on exported energy, export compensation, charging tariffs, efficiency, battery degradation, aggregator fees and participation frequency. There is no universal income figure for every EV owner.

3. Can V2G generate negative revenue?

Yes. If recharge electricity, battery wear and service expenses exceed export income and other payments, V2G operation can produce a net loss.

4. Why is round-trip efficiency important?

Some electricity is lost during charging, storage and discharging. The calculator accounts for this by estimating the electricity needed to restore the energy exported.

5. Does the calculator include battery degradation?

Yes. You can enter an estimated cost per exported kWh. This is a simplified financial allowance, not a prediction of actual battery capacity loss.

6. Does V2G revenue include frequency response payments?

The calculator provides an optional additional grid-service payment per session. Enter only payments that are separate from the export compensation to avoid counting the same income twice.

7. Does the calculator include the bidirectional charger cost?

Yes. You can enter an initial equipment investment and a recovery period. The calculator then estimates a simple annual investment allowance.

8. Is V2G profitable in Switzerland?

Profitability depends on the specific electricity contract, export compensation, market access, equipment costs and operating arrangements. Swiss users should enter their actual tariff and programme terms rather than rely on a generic revenue estimate.

Related EV and V2G Calculators